Languages:
What we do

Train

  • 150 km

    of railway track

  • 2.8 km

    long train

  • 1.5 hours

    to full load

At Cerrejón, we have an integrated infrastructure that includes 150 kilometers of railway, designed to connect our mining operation in the middle of La Guajira with Puerto Bolívar, from where our coal is shipped to international markets.

Our railway system is equipped with automatic loading and unloading technology, ensuring that each wagon is leveled, humidified, and compacted to help minimize emissions during the journey and meet environmental standards.

To ensure safety in operations, we employ a security escort system along the railway line, to help reduce the risk of accidents and promote a reliable and efficient operation.

Additionally, our train is a key tool for the well-being of nearby communities. We have tank wagons with a capacity of 80,000 liters, through which we supply drinking water to neighboring communities as part of our commitment to sustainable and social development.